10/10
There was a bit of mould on the grouting in the bathroom and some paint touch-up is required on the heating pipe in the bedroom area. The sash window and frame could do with some sprucing-up and aircon in the room is required. I understand that it is a period building, but I like modern conveniences too.
Kevin
Estada de 3 nits (juny 2025)